ANSI Safety Valve :
1.ANSI Flange End Carbon Steel Safety Valve Standard:
2.ANSI Flange End Carbon Steel Safty Valve main material of parts:









ality of the valve?
A: We have more than 17 years in this filed, and quality guarantee 18 after leaving factory.
4. Q: Is there any stock in your factory? And How long is your delivery time?
A: We stock valves with normal sizes. Generally it is 15 days if the goods are in stock. It is 25-30 days if the goods are not in stock, it is according to quantity
5. Q: Which countries do you export to ?
A: We export directly to vast majority of countries in the world.
6. Q: What certificates will you provide ?
A: We can provide ISO / WRAS and all the customers need.
7.Q: Do you provide free sample?
A:Free sample is ok for us.
8. Q:Do you accept custom design on size?
A:Yes, if the size is reasonable
9.Q: What is your terms of payment ?
A: L/C OR T/T.30% T/T in advance ,70% balance before shipment or see copy of bill of lading.
10.Q:When will I receive the valve after the payment?
A: It is usually 30days for production with MOQ. And there is extra shipment time that depends on which seaport to ship to, usually 15-30days for ocean shipping, and 4-7days for air shipping.



1.ANSI Flange End Carbon Steel Safety Valve Standard:
| Production Size | 1"-6" |
| Pressure range | 150LB,300LB,600LB,900LB,1500LB |
| Design Standard | MSS SP-70 |
| Face to Face | ANSI B16.10 |
| Flange Standard | ANSI B16.10 |
| Testing Standard: | MSS SP-70,API 598 |
| Body | WCB/WC6/WC9/LCB |
| Bonnet | WCB/WC6/WC9/LCB |
| Stem Nut | SS420 |
| Disc | SS304/SS316/Monel/H.C/H.B |
| Seat | SS304/SS316/Monel/H.C/H.B |
| Nozzie Ring | CF8M |
| Guide | SS304/SS316/Monel/H.C/H.B |
| Spring | Alloy Steel |
| Cap | WCB/WC6/WC9/LCB |
| Plug | Carbon Steel |
| Bellows | SS316L |









ality of the valve?
A: We have more than 17 years in this filed, and quality guarantee 18 after leaving factory.
4. Q: Is there any stock in your factory? And How long is your delivery time?
A: We stock valves with normal sizes. Generally it is 15 days if the goods are in stock. It is 25-30 days if the goods are not in stock, it is according to quantity
5. Q: Which countries do you export to ?
A: We export directly to vast majority of countries in the world.
6. Q: What certificates will you provide ?
A: We can provide ISO / WRAS and all the customers need.
7.Q: Do you provide free sample?
A:Free sample is ok for us.
8. Q:Do you accept custom design on size?
A:Yes, if the size is reasonable
9.Q: What is your terms of payment ?
A: L/C OR T/T.30% T/T in advance ,70% balance before shipment or see copy of bill of lading.
10.Q:When will I receive the valve after the payment?
A: It is usually 30days for production with MOQ. And there is extra shipment time that depends on which seaport to ship to, usually 15-30days for ocean shipping, and 4-7days for air shipping.


