Annual output of 300, 000cbm gas filling device / gas block / gas machine

Annual 300, 000CBM aac plant /aac block/aac machineWe can supply our customer for designning, production, installation, commissioning, training and good after-sale service.Aac plant /aac block/aac machine Capacity: From 50000 cubic meter to 300, 000 cubic meters per year.Aac plant /aac block/aac machine Equipments: Stocking raw

Featured Products

Annual 300, 000CBM aac plant /aac block/aac machine
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine



We can supply our customer for designning, production, installation, commissioning, training and good after-sale service.
Aac plant /aac block/aac machine Capacity: From 50000 cubic meter to 300, 000 cubic meters per year.
Aac plant /aac block/aac machine Equipments: Stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc.,
1 Product weight is according to 600kg/m3 to control.
2 annual capacity 300, 000M3.
3 set raw material proportion: Cement 6.5%, raw lime 23%, flyash 68%, gypsum 3%, aluminum paste powder 350G/M3.
4 water and material rate 0.631
5 one mould product 2.88M3
6 Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes.
7 casting slurry temperature 38-42 degree
8 body quiet stop. Time is 1.5-2.5hours, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa
9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 7 hours/1.2Mpa total 7.5 hours
10. Cement lime fly ash style aerated block raw material proportion
Name unit Cement lime fly ash

Flash % 65-70
Cement % 6-15
Lime % 18-25
Gypsum % 3-5
Aluminum powder paste(600kg/m3) 1/10000 8
Water & material rate 0.60-0.65
Casting system OC 36-40
Aluminum mixing time S 30-40

11. Aac plant /aac block/aac machine Cement lime Sand style aerated block raw material proportion
Name Unit Cement Lime Sand
Sand % 55-65
Cement % 10-20
Lime % 20-30
Gypsum % 2-3
Aluminum powder paste(600kg/m3) 1/10000 8
Water & material rate 0.65-0.75
Casting system OC 35-38
Aluminum mixing time S 30-40
Reference: Cement is 42.5 Portland or 42.5 common cement
Aluminum power paste calculate to use according to 600kg/m3
Remark: The accurate batching rate is adjustable according to the raw material locally
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine



Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine
Annual 300, 000cbm AAC Plant /AAC Block/AAC Machine