Bury based steam locomotive 80097 found to need work costing £6500+

2022-08-13 06:23:11 By : Mr. Frank Lau

No products in the basket.

Work in the firebox of 80097 // Credit: Bury Standard 4 Group

The Bury Standard 4 Group has found a split steam tube on BR Standard 4 No. 80097, currently residing at the East Lancashire Railway.

This is the second tube to fail in three years after the boiler was overhauled by a specialist company in 2018.

The bad news is that the boiler inspector has said that all the small tubes must now be replaced.

Work has seen the tubes removed for a full inspection inside the boiler to see what condition the large tubes are in.

For this to happen, the running board, steam pipe cladding, main smokebox steam pipes and the brick arch have had to be removed.

This is a major blow for the group, with the small tubes costing £6500 plus labour. The other blow is that 80097 will not be earning any steaming fees on the East Lancs Railway.

If you would like to donate towards the cost of the replacement, you can do so over on the Bury Standard 4 Group website.

An investment of £1.4 million has been made by Network Rail in order to provide a much safer...

This book provides a selection of photographs of LMS and LNER locomotives after Nationalisation, and technical details for each locomotive...

© RailAdvent Ltd 2014 - 2022 Registered in England & Wales Company Number: 13512367 VAT Number: 392755949

© RailAdvent Ltd 2014 - 2022 Registered in England & Wales Company Number: 13512367 VAT Number: 392755949

Login to your account below

Please enter your username or email address to reset your password.

Please log in again. The login page will open in a new tab. After logging in you can close it and return to this page.